How to deal with cracked charging cables of charging piles
Fri Mar 31, 2023 7:33 am
With the promotion of low-carbon travel, more and more electric vehicles appear in everyone's field of vision, its related industrial chain is also gradually developed, the construction of charging piles is increasingly developed, consumers should learn to distinguish between good and bad charging pile products on the market, to prevent the phenomenon of cracking in subsequent use.
If the charging pile cable is cracked, you should immediately stop using the charging pile and repair and replace the charging pile cable. Cable cracking is mainly due to long-term overload operation, due to the thermal effect of current, current through the cable leads to conductor heating, while the collector effect of charge and eddy current loss of steel armor, insulation medium loss will also generate additional heat, thus increasing the temperature of the cable. Long-term overload operation, high temperature will accelerate the aging of insulation, and insulation is broken. In general, good quality charging pile cable has good insulation effect, but the charging pile cable may wear out under long-term use, so in order to ensure the safety of the charging pile cable should be regularly checked whether the insulation part of the charging pile cable is complete and whether the insulation effect is excellent, the switch and socket and other cables and wires can not leak out, only then can we ensure the safety and durability of the charging pile cable.
Charging cable as a connection between electric vehicles and charging pile current carrier, both need to carry out the information transmission between the two, but also to control the charging, but also to ensure excellent insulation performance based on high aging, heat, oil, weather and other properties, because in the use of the process often to bend, drag, so also require the flexibility of the cable and mechanical properties. So you should use the charging pile cables that meet the standard.
For more charging pile cable product information, please f visit or search:[url= https://www.omgevcable.com] https://www.omgevcable.com[/url]
If the charging pile cable is cracked, you should immediately stop using the charging pile and repair and replace the charging pile cable. Cable cracking is mainly due to long-term overload operation, due to the thermal effect of current, current through the cable leads to conductor heating, while the collector effect of charge and eddy current loss of steel armor, insulation medium loss will also generate additional heat, thus increasing the temperature of the cable. Long-term overload operation, high temperature will accelerate the aging of insulation, and insulation is broken. In general, good quality charging pile cable has good insulation effect, but the charging pile cable may wear out under long-term use, so in order to ensure the safety of the charging pile cable should be regularly checked whether the insulation part of the charging pile cable is complete and whether the insulation effect is excellent, the switch and socket and other cables and wires can not leak out, only then can we ensure the safety and durability of the charging pile cable.
Charging cable as a connection between electric vehicles and charging pile current carrier, both need to carry out the information transmission between the two, but also to control the charging, but also to ensure excellent insulation performance based on high aging, heat, oil, weather and other properties, because in the use of the process often to bend, drag, so also require the flexibility of the cable and mechanical properties. So you should use the charging pile cables that meet the standard.
For more charging pile cable product information, please f visit or search:[url= https://www.omgevcable.com] https://www.omgevcable.com[/url]
- Advantages of high-power charging cables for charging piles
- What specifications of cables should be used for electric vehicle charging piles
- Provide electric vehicle cables/charging cables/single phase 16A and 3.6kw
- The Flexible And Efficient Charging Solution Of Spring Charging Cables
- Introduction to the materials used in DC charging pile cables
Permissions in this forum:
You cannot reply to topics in this forum